Build

All Volkswagen Tiguan related discussions
Post Reply
Ethanboothroyd
Posts: 2
Joined: Mon Aug 19, 2019 8:59 pm

Build

Post by Ethanboothroyd » Fri Sep 06, 2019 6:18 pm

Hi

All new to the group

I ordered my brand new Tiguan All-space Match on 19th August 2019 and i have just had an email from tracker and phone call from dealer to say the build week has been confirmed for last week in October only question I have is could the car be built before then as I know they usually confirm them 4 weeks before your confirmed build week
Tiguan All Space Match 1.5 TSI DSG White , Optional Winter Pack And Heated Steering Wheel Ordered 19th August 2019 :) :)


JK-VWTiguanR
Posts: 2037
Joined: Sun Nov 26, 2017 6:36 pm

Re: Build

Post by JK-VWTiguanR » Sat Sep 07, 2019 7:38 am

Hello and welcome to the forum.

I would say the date is about right and cars do not normally get built 4 weeks early then confirmed dates it may come forward a day or two.
2019 19-Plate 230hp Tiguan R-Line Tech in White with Loads of Extras
Replaced: 2018 18-Plate 240hp Tiguan R-Line in White with Loads of Extras.


swifty19_89
Posts: 59
Joined: Mon Jun 03, 2019 11:55 am

Re: Build

Post by swifty19_89 » Sat Sep 07, 2019 9:08 am

My allspace had a build week of 19th August.
The week after I received my 5a, not heard anything since.
Tiguan Allspace SEL
Blue Silk Metallic
Heated Steering Wheel
Door Wind Deflectors
Running Boards

Date Ordered: 04/06/19
Stage 3 (Build week confirmed): 28/06/19
Build Week 34 (w/c 19/08/19)
Stage 5a (left factory): 27/08/19


SEL_
Posts: 19
Joined: Sat Sep 07, 2019 1:53 pm

Re: Build

Post by SEL_ » Sat Sep 07, 2019 1:59 pm

Hi all, I’m new to the forum also. Have been looking around for a while.

We ordered an Allsapce SEL, with Area view as the only option 12th May, build week unknown but had a 5a text on 21st August. Since then nothing. Is a 5a still awaiting to get on the boat or will it have left the port?

Cheers.
Tiguan Allsapce SEL
Deep Black Pearl
Area View
Ordered 12/05/19
5a 21/08/19
5b 24/09/19
5c x 2 01/10/19
6 04/10/19
7 11/10/19
Collection due 26/10/19


Deano2085
Posts: 5
Joined: Sat Jun 22, 2019 3:20 pm

Re: Build

Post by Deano2085 » Thu Sep 12, 2019 7:40 pm

For those still in the waiting stage, this is how my order has gone so far, I’ll miss out the first bit as everyone’s order will be different depending on what they ordered but (this is all based off the text messages):

Stage 3 - 13 Aug
Stage 5a - 5 Sept
Stage 5b - 7 Sept
Stage 5c - 10 Sept
Stage 6 - 11 Sept

It amazes me how fast they can get it to the UK then advise 7-10 days to get from the port to the dealer. It was built a week before I was advised so all in all I’m happy, just need it to make its way to the dealer now.

Hope this helps.



Sent from my iPhone using Tapatalk


shaggybpc
Posts: 9
Joined: Thu Jul 18, 2019 5:47 pm

Re: Build

Post by shaggybpc » Thu Sep 12, 2019 7:48 pm

Deano2085
have you had two stage 6 texts ? I presume the 2nd was after it had cleared customs ?


Deano2085
Posts: 5
Joined: Sat Jun 22, 2019 3:20 pm

Re: Build

Post by Deano2085 » Fri Sep 13, 2019 6:10 am

shaggybpc wrote:Deano2085
have you had two stage 6 texts ? I presume the 2nd was after it had cleared customs ?
Nope, just the one at the moment. I was expecting a stage 7 next but I’m not sure where it is at the moment and don’t want to be that person bugging the dealer, I’m just trying to be patient.


Sent from my iPhone using Tapatalk


shaggybpc
Posts: 9
Joined: Thu Jul 18, 2019 5:47 pm

Re: Build

Post by shaggybpc » Fri Sep 13, 2019 12:34 pm

Just had stage 7 this morning after having a txt yesterday :D


SEL_
Posts: 19
Joined: Sat Sep 07, 2019 1:53 pm

Re: Build

Post by SEL_ » Fri Sep 13, 2019 8:06 pm

Still nothing further on mine. 21st August had 5a. Wondering if it’s even left Mexico.
Tiguan Allsapce SEL
Deep Black Pearl
Area View
Ordered 12/05/19
5a 21/08/19
5b 24/09/19
5c x 2 01/10/19
6 04/10/19
7 11/10/19
Collection due 26/10/19


swifty19_89
Posts: 59
Joined: Mon Jun 03, 2019 11:55 am

Re: Build

Post by swifty19_89 » Fri Sep 13, 2019 10:55 pm

SEL_ wrote:Still nothing further on mine. 21st August had 5a. Wondering if it’s even left Mexico.
I’m the similar to you, build week was 19th August then got my 5a the following week.
Not received my 5b yet but is that on the ferry to Emden?

I’ve been keeping my eye on the ferries anyway and it could be on either
Bishu Highway or SIEM Cicero but it’s probably still sat in Mexico somewhere.
Tiguan Allspace SEL
Blue Silk Metallic
Heated Steering Wheel
Door Wind Deflectors
Running Boards

Date Ordered: 04/06/19
Stage 3 (Build week confirmed): 28/06/19
Build Week 34 (w/c 19/08/19)
Stage 5a (left factory): 27/08/19


Post Reply

Return to “Main Volkswagen Tiguan chat”


VW Tiguan MK2 Forums

Our VW Tiguan MK2 Forums are free to join and open to all.