Build

All Volkswagen Tiguan related discussions
Post Reply
Dark Moss Olly
Posts: 12
Joined: Mon Sep 02, 2019 10:34 am

Re: Build

Post by Dark Moss Olly » Fri Oct 04, 2019 11:19 am

Has anyone else noticed the Primrose Ace creeping its way to Emden? Has been to the usual ports, and was in Veracruz on the 18th September....could it be??


swifty19_89
Posts: 59
Joined: Mon Jun 03, 2019 11:55 am

Re: Build

Post by swifty19_89 » Fri Oct 04, 2019 11:35 am

Just realised after updating my phone the text and email notifications reset to ‘off’ so I’m now wondering if I have missed a notification....

The app just states the numbers and doesn’t go into detail about what part of 5 I am at.

Just emailed dealership, he’s probably sick of me haha.
Tiguan Allspace SEL
Blue Silk Metallic
Heated Steering Wheel
Door Wind Deflectors
Running Boards

Date Ordered: 04/06/19
Stage 3 (Build week confirmed): 28/06/19
Build Week 34 (w/c 19/08/19)
Stage 5a (left factory): 27/08/19


George2
Posts: 18
Joined: Wed Aug 07, 2019 7:46 pm

Re: Build

Post by George2 » Fri Oct 04, 2019 5:19 pm

Hi everyone my dealer called today and said they think that VW order tracker is down. That's why a lot off the cars on order haven't moved from 5a


swifty19_89
Posts: 59
Joined: Mon Jun 03, 2019 11:55 am

Re: Build

Post by swifty19_89 » Fri Oct 04, 2019 6:10 pm

I got the same response via email ‘Still says transit to ship , the system has had problems updating , I got an email this morning saying a lot of cars have moved forward but not updated on the system , if anything changes will let you know’
Tiguan Allspace SEL
Blue Silk Metallic
Heated Steering Wheel
Door Wind Deflectors
Running Boards

Date Ordered: 04/06/19
Stage 3 (Build week confirmed): 28/06/19
Build Week 34 (w/c 19/08/19)
Stage 5a (left factory): 27/08/19


amv
Posts: 39
Joined: Mon Jun 10, 2019 9:04 pm

Re: Build

Post by amv » Fri Oct 04, 2019 6:32 pm

swifty19_89 wrote:
Fri Oct 04, 2019 6:10 pm
I got the same response via email ‘Still says transit to ship , the system has had problems updating , I got an email this morning saying a lot of cars have moved forward but not updated on the system , if anything changes will let you know’
It seems that vw uk system might be lagging, because as it happens, I have order tiguan on 6th June, and today i got email from the dealer that its in Sweden ( I think it came on neckar highway, which also went to Grimsby before coming to Malmö),

so if we re on same boat Literally , your might be carrying out same journey after as well i.e. on the way to dealer sometime since Tuesday/Wednesday , Its will be audacious to think that it might land with dealer by tomorrow, aaah but one hopes... :(


swifty19_89
Posts: 59
Joined: Mon Jun 03, 2019 11:55 am

Re: Build

Post by swifty19_89 » Fri Oct 04, 2019 6:40 pm

amv wrote:
swifty19_89 wrote:
Fri Oct 04, 2019 6:10 pm
I got the same response via email ‘Still says transit to ship , the system has had problems updating , I got an email this morning saying a lot of cars have moved forward but not updated on the system , if anything changes will let you know’
It seems that vw uk system might be lagging, because as it happens, I have order tiguan on 6th June, and today i got email from the dealer that its in Sweden ( I think it came on neckar highway, which also went to Grimsby before coming to Malmö),

so if we re on same boat Literally , your might be carrying out same journey after as well i.e. on the way to dealer sometime since Tuesday/Wednesday , Its will be audacious to think that it might land with dealer by tomorrow, aaah but one hopes... :(
So if it’s now arrived in Sweden for you what does the app say for you and what was your last automated update? I.e 5a, 5b etc.
Tiguan Allspace SEL
Blue Silk Metallic
Heated Steering Wheel
Door Wind Deflectors
Running Boards

Date Ordered: 04/06/19
Stage 3 (Build week confirmed): 28/06/19
Build Week 34 (w/c 19/08/19)
Stage 5a (left factory): 27/08/19


amv
Posts: 39
Joined: Mon Jun 10, 2019 9:04 pm

Re: Build

Post by amv » Fri Oct 04, 2019 6:46 pm

we dont have that type of tracking here in Sweden. It just the information from dealer no stage either. I have to manually contact and get the updates. other thing I figured out from them for example They told me that on last sunday it was on loaded on boat , so i checked which boat is coming from emden to Sweden and so on...


swifty19_89
Posts: 59
Joined: Mon Jun 03, 2019 11:55 am

Re: Build

Post by swifty19_89 » Fri Oct 04, 2019 7:06 pm

amv wrote:we dont have that type of tracking here in Sweden. It just the information from dealer no stage either. I have to manually contact and get the updates. other thing I figured out from them for example They told me that on last sunday it was on loaded on boat , so i checked which boat is coming from emden to Sweden and so on...
Is yours Allspace for SWB?
Tiguan Allspace SEL
Blue Silk Metallic
Heated Steering Wheel
Door Wind Deflectors
Running Boards

Date Ordered: 04/06/19
Stage 3 (Build week confirmed): 28/06/19
Build Week 34 (w/c 19/08/19)
Stage 5a (left factory): 27/08/19


amv
Posts: 39
Joined: Mon Jun 10, 2019 9:04 pm

Re: Build

Post by amv » Fri Oct 04, 2019 7:39 pm

what Does SWB entails?


swifty19_89
Posts: 59
Joined: Mon Jun 03, 2019 11:55 am

Re: Build

Post by swifty19_89 » Fri Oct 04, 2019 8:24 pm

amv wrote:what Does SWB entails?
It means Short Wheel Base.

Don’t know the specs for Sweden but in the UK Short Wheel Base is 5 seats with Allspace being 7 seats.
Tiguan Allspace SEL
Blue Silk Metallic
Heated Steering Wheel
Door Wind Deflectors
Running Boards

Date Ordered: 04/06/19
Stage 3 (Build week confirmed): 28/06/19
Build Week 34 (w/c 19/08/19)
Stage 5a (left factory): 27/08/19


Post Reply

Return to “Main Volkswagen Tiguan chat”


VW Tiguan MK2 Forums

Our VW Tiguan MK2 Forums are free to join and open to all.