Build

All Volkswagen Tiguan related discussions
Post Reply
swifty19_89
Posts: 59
Joined: Mon Jun 03, 2019 11:55 am

Re: Build

Post by swifty19_89 » Sat Oct 05, 2019 8:28 am

For those still waiting on info on their Allspace models these three are due in Emden in the next week.

Primrose Ace Image Emden 10/10/2019
Hoegh Bangkok Image Emden 12/10/2019
Viking Queen Image Emden 13/10/2019

https://www.vesselfinder.com/ports/EMDEN-GERMANY-1987

Another morning has passed and I’m still at 5a.
Tiguan Allspace SEL
Blue Silk Metallic
Heated Steering Wheel
Door Wind Deflectors
Running Boards

Date Ordered: 04/06/19
Stage 3 (Build week confirmed): 28/06/19
Build Week 34 (w/c 19/08/19)
Stage 5a (left factory): 27/08/19


SGreen679
Posts: 84
Joined: Fri Aug 02, 2019 6:00 pm

Re: Build

Post by SGreen679 » Sat Oct 05, 2019 9:05 am

swifty19_89 wrote:
Sat Oct 05, 2019 8:28 am
For those still waiting on info on their Allspace models these three are due in Emden in the next week.

Primrose Ace Image Emden 10/10/2019
Hoegh Bangkok Image Emden 12/10/2019
Viking Queen Image Emden 13/10/2019

https://www.vesselfinder.com/ports/EMDEN-GERMANY-1987

Another morning has passed and I’m still at 5a.
Swifty I presume you know about https://www.marinetraffic.com as well where you can see arrivals, departures and location etc. In case you didn’ t, enjoy.
Last edited by SGreen679 on Sat Oct 05, 2019 9:17 am, edited 1 time in total.
In my 3rd 2.0tdi 150bhp Tiguan now which have all been mk1 Rlines. Now ordered my 4th. Mk2 R-Line, White, Side Scan, Towbar, H/L Washers. Build week 39


SGreen679
Posts: 84
Joined: Fri Aug 02, 2019 6:00 pm

Re: Build

Post by SGreen679 » Sat Oct 05, 2019 9:17 am

Wow, that was a quick drop off at Grimsby by EMS Highway from Emden. Less than 24hours and now she is off to Sweden for a drop off.
In my 3rd 2.0tdi 150bhp Tiguan now which have all been mk1 Rlines. Now ordered my 4th. Mk2 R-Line, White, Side Scan, Towbar, H/L Washers. Build week 39


George2
Posts: 19
Joined: Wed Aug 07, 2019 7:46 pm

Re: Build

Post by George2 » Sat Oct 05, 2019 11:09 am

As anyone had a update on there Allspace after 25/08/2019 from a 5A ?


swifty19_89
Posts: 59
Joined: Mon Jun 03, 2019 11:55 am

Re: Build

Post by swifty19_89 » Sat Oct 05, 2019 11:53 am

George2 wrote:As anyone had a update on there Allspace after 25/08/2019 from a 5A ?
Those that received 5a before your date and mine have since received 5b/5c etc.

I’m like you and stuck on 5a with my dealer saying still in Mexico but also added they think the system is down.
Tiguan Allspace SEL
Blue Silk Metallic
Heated Steering Wheel
Door Wind Deflectors
Running Boards

Date Ordered: 04/06/19
Stage 3 (Build week confirmed): 28/06/19
Build Week 34 (w/c 19/08/19)
Stage 5a (left factory): 27/08/19


George2
Posts: 19
Joined: Wed Aug 07, 2019 7:46 pm

Re: Build

Post by George2 » Sat Oct 05, 2019 12:52 pm

I'm thinking since my car as been in transit 7 ships have been loaded in Mexico. 4 have already got to Emden 3 more in the next few day. Are next update will probably 7 at the dealer


George2
Posts: 19
Joined: Wed Aug 07, 2019 7:46 pm

Re: Build

Post by George2 » Sat Oct 05, 2019 1:04 pm

George2 wrote:
Sat Oct 05, 2019 12:52 pm
I'm thinking since my car as been in transit 7 ships have been loaded in Mexico. 4 have already got to Emden 3 more in the next few day. Are next update will probably 7 at the dealer
Just been looking on Vessel tracker 4 ships have been to Grimsby in last 3 days 3 more in next 2 days :?:


Dark Moss Olly
Posts: 12
Joined: Mon Sep 02, 2019 10:34 am

Re: Build

Post by Dark Moss Olly » Sun Oct 06, 2019 7:10 am

Eventually I emailed the dealer on Friday who told me mine was in the exit port in Germany so about three weeks to the dealer. Sure enough I just got my 5c text and email! Getting there chaps I can’t wait


swifty19_89
Posts: 59
Joined: Mon Jun 03, 2019 11:55 am

Re: Build

Post by swifty19_89 » Sun Oct 06, 2019 7:48 am

Dark Moss Olly wrote:Eventually I emailed the dealer on Friday who told me mine was in the exit port in Germany so about three weeks to the dealer. Sure enough I just got my 5c text and email! Getting there chaps I can’t wait
What was your build week and then when did you get your 5a and 5b?

Did you get your 5c this morning?
Tiguan Allspace SEL
Blue Silk Metallic
Heated Steering Wheel
Door Wind Deflectors
Running Boards

Date Ordered: 04/06/19
Stage 3 (Build week confirmed): 28/06/19
Build Week 34 (w/c 19/08/19)
Stage 5a (left factory): 27/08/19


Dark Moss Olly
Posts: 12
Joined: Mon Sep 02, 2019 10:34 am

Re: Build

Post by Dark Moss Olly » Sun Oct 06, 2019 8:22 am

We ordered third week of May, build week confirmed as 34 by the dealer. 5a 24/08, 5b 29/09 and 5c this morning at 8.06. Hope that’s useful info


Post Reply

Return to “Main Volkswagen Tiguan chat”


VW Tiguan MK2 Forums

Our VW Tiguan MK2 Forums are free to join and open to all.