Build

All Volkswagen Tiguan related discussions
SEL_
Posts: 19
Joined: Sat Sep 07, 2019 1:53 pm

Re: Build

Post by SEL_ » Tue Oct 08, 2019 6:00 pm

Spoke with the dealer today. They expect it there by the end of next week. Looks like it will have sat at the port for a few weeks.
Tiguan Allsapce SEL
Deep Black Pearl
Area View
Ordered 12/05/19
5a 21/08/19
5b 24/09/19
5c x 2 01/10/19
6 04/10/19
7 11/10/19
Collection due 26/10/19


swifty19_89
Posts: 59
Joined: Mon Jun 03, 2019 11:55 am

Re: Build

Post by swifty19_89 » Tue Oct 08, 2019 7:31 pm

I’m just hoping with every passing day that I’ve missed 5b, 5c and it’s further along than first thought.

Looking at everyone’s updates from 5b onwards it looks like it progresses to the next stage weekly. So I’m definitely looking at mid November at the earliest, if it’s still on 5a, that brings all kind of unknown issues with Brexit.
Tiguan Allspace SEL
Blue Silk Metallic
Heated Steering Wheel
Door Wind Deflectors
Running Boards

Date Ordered: 04/06/19
Stage 3 (Build week confirmed): 28/06/19
Build Week 34 (w/c 19/08/19)
Stage 5a (left factory): 27/08/19


Dark Moss Olly
Posts: 12
Joined: Mon Sep 02, 2019 10:34 am

Re: Build

Post by Dark Moss Olly » Wed Oct 09, 2019 7:17 am

Just had my second stage 6 a couple of minutes ago so looks like it could be loaded up onto a transporter shortly. @swifty19_89 your dates are very similar to mine, aside from the steering wheel I'd be amazed if yours isn't in the same batch.


SGreen679
Posts: 84
Joined: Fri Aug 02, 2019 6:00 pm

Re: Build

Post by SGreen679 » Wed Oct 09, 2019 8:23 am

swifty19_89 wrote:
Tue Oct 08, 2019 7:31 pm
I’m just hoping with every passing day that I’ve missed 5b, 5c and it’s further along than first thought.

Looking at everyone’s updates from 5b onwards it looks like it progresses to the next stage weekly. So I’m definitely looking at mid November at the earliest, if it’s still on 5a, that brings all kind of unknown issues with Brexit.
Swifty, I don’t know how you have the patience. I’d be kicking off now with your dealer. You have the patience of a saint.
In my 3rd 2.0tdi 150bhp Tiguan now which have all been mk1 Rlines. Now ordered my 4th. Mk2 R-Line, White, Side Scan, Towbar, H/L Washers. Build week 39


SGreen679
Posts: 84
Joined: Fri Aug 02, 2019 6:00 pm

Re: Build

Post by SGreen679 » Wed Oct 09, 2019 8:24 am

Dark Moss Olly wrote:
Wed Oct 09, 2019 7:17 am
Just had my second stage 6 a couple of minutes ago so looks like it could be loaded up onto a transporter shortly. @swifty19_89 your dates are very similar to mine, aside from the steering wheel I'd be amazed if yours isn't in the same batch.
The updates keep coming, I have also had my second stage 6 update this morning.
In my 3rd 2.0tdi 150bhp Tiguan now which have all been mk1 Rlines. Now ordered my 4th. Mk2 R-Line, White, Side Scan, Towbar, H/L Washers. Build week 39


swifty19_89
Posts: 59
Joined: Mon Jun 03, 2019 11:55 am

Re: Build

Post by swifty19_89 » Wed Oct 09, 2019 11:28 am

I will give it to the end of the week and see if I’ve received any text update.
I’m calm in someways as I always had in my head that October would be when it’s eventually here.
At one point my dealer said it’s on track for September (that was hard to believe)

We are going away on the 19th October as a family and would have been perfect for then, mainly to show it off but also to give it a good drive out, fill it’s massive boot with suitcases, wheelchair, walking frame etc.
Give it its first test.
If it’s at Stage 6 like you guys then it’s a still a possibility, if not then who knows when.

Have your apps updated to stage 6 as well? Mines still at 5.

I’m glad yours are all ticking along nicely but it’s now annoying me that similar build weeks are well on with delivery and mine is stuck anything between a 100miles to 5 and half thousand miles.
Tiguan Allspace SEL
Blue Silk Metallic
Heated Steering Wheel
Door Wind Deflectors
Running Boards

Date Ordered: 04/06/19
Stage 3 (Build week confirmed): 28/06/19
Build Week 34 (w/c 19/08/19)
Stage 5a (left factory): 27/08/19


amv
Posts: 39
Joined: Mon Jun 10, 2019 9:04 pm

Re: Build

Post by amv » Wed Oct 09, 2019 2:10 pm

Hello Swiftly , as of today my car is with dealer they are "unlocking it" and will do some mumbo jumbo before handing it over ,but it going to be next week ,

so it took from 6th July to 9th october to order-confirm-manufacture-ship-deliver to dealer + ( cheerfully hoping till monday it will all be done) 3 days to get it in hand,

since you had almost similar order date there is my timeline for comparison... and my car is not 7 seater its 5 seater with 18" 255/65.


SEL_
Posts: 19
Joined: Sat Sep 07, 2019 1:53 pm

Re: Build

Post by SEL_ » Wed Oct 09, 2019 2:34 pm

Seems like you guys are overtaking me now. Still no 2nd stage 6. Dealer said with them end of next week though so we’ll see.
Tiguan Allsapce SEL
Deep Black Pearl
Area View
Ordered 12/05/19
5a 21/08/19
5b 24/09/19
5c x 2 01/10/19
6 04/10/19
7 11/10/19
Collection due 26/10/19


SGreen679
Posts: 84
Joined: Fri Aug 02, 2019 6:00 pm

Re: Build

Post by SGreen679 » Wed Oct 09, 2019 4:56 pm

Just had a call from the dealer and my car arrived this afternoon. Going to see it tomorrow.

Swifty, am I correct yours is from the same Bolton dealer. they said they had a few delivered I’d give them a ring tomorrow just in the off chance.

All excited now 😀
In my 3rd 2.0tdi 150bhp Tiguan now which have all been mk1 Rlines. Now ordered my 4th. Mk2 R-Line, White, Side Scan, Towbar, H/L Washers. Build week 39


swifty19_89
Posts: 59
Joined: Mon Jun 03, 2019 11:55 am

Build

Post by swifty19_89 » Wed Oct 09, 2019 5:02 pm

SGreen679 wrote:Just had a call from the dealer and my car arrived this afternoon. Going to see it tomorrow.

Swifty, am I correct yours is from the same Bolton dealer. they said they had a few delivered I’d give them a ring tomorrow just in the off chance.

All excited now Image
Bolton Inscape? Yeah that’s the one.

Nice one, not heard anything yet, will ring them Friday anyway.

By any chance your salesman isn’t someone (don’t want to name them) who has another car manufacturer in his surname? Image
Tiguan Allspace SEL
Blue Silk Metallic
Heated Steering Wheel
Door Wind Deflectors
Running Boards

Date Ordered: 04/06/19
Stage 3 (Build week confirmed): 28/06/19
Build Week 34 (w/c 19/08/19)
Stage 5a (left factory): 27/08/19


Post Reply

Return to “Main Volkswagen Tiguan chat”


VW Tiguan MK2 Forums

Our VW Tiguan MK2 Forums are free to join and open to all.